Aquability OPS Ltd modified and optimised the failing Jet Tech SBR’s at the one million PE Saltend WWTP at Hull. The plant now consistently achieves it’s effluent consent with a 20% reduction in total power consumption.
Upgrading and Optimising the Lamellas and Jet Tech SBR’s at Hull’s Saltend WWTP
![Saltend Wastewater Treatment Plant](https://aquabilityops.com/wp-content/uploads/2017/06/Saltend_lowres2-648x364.png)