Aquability OPS Ltd modified and optimised the failing Jet Tech SBR’s at the one million PE Saltend WWTP at Hull. The plant now consistently achieves it’s effluent consent with a 20% reduction in total power consumption.
Optimising the Performance of the Beverley CASS SBR Plant
Second contract awarded to Aquability for Nigg WWTP in Aberdeen
Kelda Water Services have awarded Aquability a contract to implement some of the modifications recommended in their review of the Nigg WWTP. Aquability will write and commission a new control philosophy for the lamella settling tanks which will provide a more flexible and efficient method of sludge removal to improve performance and optimise sludge dry solids content.